153
153

Neubau des Bildungszentrums Bau in Geradstetten – New construction of the Bau education centre

Bildungszentrum Bau, IBA’27 Projekt, Bauwende, nachhaltiges Bauen, zirkuläres Baue, Bauausbildung Baden-Württemberg, Remshalden Geradstetten, moderner Lernort Bau, Bauwirtschaft BW, Schenker Salvi Weber, Bauinnovation, Ausbildung Bauwirtschaft

Neubau des Bildungszentrums Bau in Geradstetten – New construction of the Bau education centre

All projects

Logo IBA27

Learning to build for the future

In order to strengthen the next generation and promote sustainable construction through further training opportunities, the Baden-Württemberg Construction Industry Association (Verband Bauwirtschaft Baden-Württemberg e.V.) is creating a sustainable educational location that combines spaces for learning, living and meeting in a space-saving and climate-friendly way.

Whether rainwater retention basins, infiltration systems, underground heat storage facilities or low-sealing roads: civil engineering structures can make an important contribution to climate improvement. In the Remstal valley, not far from Stuttgart, trainees in the construction industry have been learning the practical skills of their profession since the 1970s. Originally established primarily for building construction, the Bau training centre in Remshalden-Geradstetten now focuses on civil engineering professions and construction equipment operation. On the green riverbank, a compact ensemble of workshops with additional seminar and accommodation buildings will replace the ageing existing structures, leaving plenty of space for leisure and socialising with generous open areas. Visible constructions such as supporting structures in steel and timber frame construction and floors made of recycled concrete processed in various ways demonstrate the appropriate use of materials, while halls connected in a windmill pattern with associated open building yards enable collaborative, cross-disciplinary work with short distances. Green open spaces with biotope and retention areas serve as recreational areas and thus exemplify the structural implementation of climate-improving measures.

Facts and Figures

PlaceRemshalden-Geradstetten, Rems-Murr-Kreis
Sizeapprox. 2.5 hectares
+Space for approximately 700 trainees annually
Project startin the IBA’27 network since 2022
Timeline2023 Building construction competition:
Schenker Salvi Weber Architekten ZT GmbH (AT-Vienna) with
KRAFT.RAUM Landscape Architecture and Urban Development (Düsseldorf)
2025 Inclusion as an IBA’27 project and planned start of construction
2027 Planned completion, 1st construction phase (seminar building)
2028 Planned completion, 2nd construction phase (factory halls)
Project sponsor: Bauwirtschaft Baden-Württemberg e.V.
Project initiatorBauwirtschaft Baden-Württemberg e.V.

Contact

Project initiator

Bauwirtschaft Baden-Württemberg e.V.
Zentrumsleiter Dewi Evans und Projektassistentin Celine Palpella
Hohenzollernstraße 25
70178 Stuttgart
stuttgart@bauwirtschaft-bw.de

IBA’27 Project manager

Dr. Raquel Jaureguízar


Aerial View

Location of the IBA’27 project »New construction of the Bau education centre in Geradstetten«. Credits: Geobasisdaten LGL, www.lgl-bw.de

Latest magazine articles

more

Logo IBA27